7/7/2011 | Brazil
First well in Lula field confirms high production potential
The P1 well, the first commercial production well at the pre-salt Santos Basin, in Lula field, has reached in May an average production of 28,436 barrels of oil per day (bpd), confirming the high potential of the Brazilian pre-salt reservoirs.